In 2018, the total electricity generation of our country has increased by 1.2% compared to 2017 and has reached 300.71 billion kWh in 2018. In the same period, the electricity consumption has increased by 1.8 % reaching to 300.10 billion kWh.
The peak demand, which was 47,660 MW in 2017, has decreased by 3,1 % and was realized as 46,160MW.
With the commissioning of the new power plants, Turkey’s overall established power capacity has reached to 88,550.80 MW in 2018, accordingly.
The project design for the Çaypınar Wind Power Plant that our company holds the Pre-License has been initiated as of 2018. The procedures for permission that are required to be taken for the investment processes of our project located in Balıkesir province, Kepsut district, are still continuing.
Owned by our overseas subsidy, Ayen AS Energji SHA, our investment, that has reached to 110 MW in established capacity with the commissioning of the Fangut Dam and HEPP, has realized 340 million kWh electricity production in 2018.
The Contract for Kalivac Dam and Hydroelectricity Power Plant project which has a 366.6 million kWh electricity power production capacity with its 111 MW established power, was signed mutually with the Republic of Albania, Ministry of Energy and Industry, and the project design works and permission processes are continuing.
Our company markets the electricity energy that it generates, along Europe through its electricity trading companies which are established in Albania, Serbia and Slovenia, and aims to increase its effectivity in Middle and South Europe through the commercial electricity activities in addition to its already established new electricity generation investments.
In order to meet the energy demand that arises due to increasing population and industrial power, the necessity for the investments towards new electricity generation plants will increase gradually on a daily basis. As 100% of the established capacity is from renewable energy, our company targets to invest in electricity generation plant investments in order to meet the increasing energy demand of Turkey, and continues to work on new investment projects beside the existing investments.