Our Plants
Fangut Dam Residual Flow HEPP
Fangut Dam Residual Flow HEPP
Fangut Dam Residual Flow HEPP is located at the downstream of the Fangut DAM. Fangut Dam Residual Flow HEPP has a maximum installed capacity of 1,11 MW and will allow an annual mean energy production of 7,446 GWh.
Fangut Dam Residual Flow HEPP is located at the downstream of the Fangut DAM. Fangut Dam Residual Flow HEPP has a maximum installed capacity of 1,11 MW and will allow an annual mean energy production of 7,446 GWh.
Technical Data
Maximum Design Discharge |
1,5 m3/s |
Nominal Design Discharge |
0,75 m3/s |
Rated Net Head at Design Discharge |
82 m |
Type of Turbine Unit |
1 Horizontal Francis |
Installed Power |
1,11 MW |
Unit Generator Capacity |
1,25 MVA |
Power Transformer |
1,25 kVA |
Anual Mean Energy |
7,446 GWh |