Peshqeshit HEPP 3
The project is located on the Fani i Madh River, in the northern part of Albania, about 100 km north-east of Tirana. The Hydropower Plant Peshqeshit HEPP 3 is using the discharge flows of the river basin of Fani i Madh River and the diversion of the inflows from the river basin of Fani i Vogel River. The Hydropower Plant Peshqeshit HEPP 3 has a maximum installed capacity of 34 MW and will allow an annual mean energy production of 118.4 GWh.
Technical Data
|
Maximal Design Discharge |
43,5 m |
|
Maximal Unit Design Discharge |
21,75 m3/s |
|
Nominal Design Discharge |
37 m3/s |
|
Nominal Unit Design Discharge |
18,5 m3/s |
|
Gross Head |
90 m |
|
Rated Net Head at Design Discharge |
82,77 m |
|
Reservoir Normal Operation Level |
255 masl |
|
Reservoir Minimum Operation Level |
253 masl |
|
Tail Water Level at Design Discharge |
165 masl |
|
Tunnel Length |
5183,82 / 4023,38 / 2174,28 m |
|
Tunnel Diameter |
4,4 / 4,4 / 3,6 m |
|
Design Discharge |
23,5 / 20 / 43,5 m |
|
Penstock Length |
85 m |
|
Penstock Diameter |
3,2 m |
|
Design Discharge |
43,5 m3/s |
|
Type of Turbine Units |
2 Vertical Francis |
|
Turbine Runner Diameter |
1,532 m |
|
Synchronous Rotational Speed of the Turbine |
428 rpm |
|
Installed Power |
34 MW |
|
Turbine Unit Nominal Power |
17 MW |
|
Unit Generator Capacity |
19 MVA |
|
Power Transformer |
32/40 MVA ONAN/ONAF |
|
Switchyard |
220 kV GIS |
|
Annual Mean Energy |
118,4 GWh |